The Cross Island Line (CRL) is Singapore's eighth MRT line and its longest fully underground line at more than 50 kilometres. It will connect the eastern, western and north-eastern corridors, linking major hubs including the Jurong Lake District, Punggol Digital District and the Changi region.

For Loyang Valley Residences, the headline is simple: Loyang MRT (CR3) sits on CRL Phase 1 — under construction now, targeted to open by 2030.

🚇 Flora Drive to Loyang MRT (CR3) — Walking Map

Flora Drive to Loyang MRT CR3 walking map — Cross Island Line walking radii 800m 1km 1.5km, eight nearby condominiums, Loyang Point, Changi Airport

Walking radii from Loyang MRT (CR3): ~800m (10 min) · ~1km (12–15 min) · ~1.5km (18–22 min)

The CRL at a Glance

FactDetail
Singapore's 8th MRT lineLongest fully underground line — over 50km
Phase 1 (CRL1)29km · 12 stations · CR2 → CR13 Bright Hill
Loyang station (CR3)On CRL1 · under construction · opens ~2030
Phase 2 (CRL2)~15km · 6 stations · opens 2032
CRL–Punggol Extension7.3km · Pasir Ris ↔ Punggol · opens 2032
Phase 3 (CRL3)~10km · 4 stations · JLD → Gul Circle · late 2030s
Interchange stations8 across the full line

Phase 1 — The Loyang Connection

CRL1 serves residential and industrial areas including Loyang, Tampines, Pasir Ris, Defu, Hougang, Serangoon North and Ang Mo Kio. More than 100,000 households will benefit from CRL1, and recreational spaces such as Changi Beach Park and Bishan–Ang Mo Kio Park become accessible by public transport.

With 8 interchange stations across the full CRL, commuters gain more alternative travel routes — resilience that matters as the network matures.

What This Means for Loyang Valley Residences

Key Takeaway

Loyang Valley Residences sits beside a confirmed, under-construction MRT station (CR3) on a fully confirmed 50km+ line. The pre-opening window remains the most attractive entry point for buyers.

Full CRL Timeline (per LTA)

PhaseStretchStationsTarget
Phase 1CR2 → Bright Hill (CR13)12 incl. Loyang (CR3)2030
CRL–Punggol Ext.Pasir Ris ↔ Punggol4 stations2032
Phase 2~15km west6 incl. King Albert Park, Clementi2032
Phase 3JLD → Gul Circle4 incl. Jurong Pier (JRL), Gul Circle (EWL)Late 2030s

Source: Land Transport Authority — lta.gov.sg / Cross Island Line

Frequently Asked Questions

Is Loyang MRT (CR3) confirmed?

Yes — CR3 is under construction as part of CRL Phase 1, targeted to open around 2030. It is not a proposal.

How far is Loyang Valley Residences from CR3?

Loyang Valley Residences is marketed as having doorstep access to Loyang MRT (CR3) along Loyang Avenue. The Flora Drive area sits within roughly 800m–1.5km walking radius, depending on exact location.

When does the full Cross Island Line open?

Phase 1 in 2030, Phase 2 and the Punggol Extension in 2032, and Phase 3 in the late 2030s (construction starts 2027).

How many interchanges does the CRL have?

8 interchange stations across the full line, connecting to the TEL, EWL, NSL, DTL, JRL and more.

Which other MRTs are near Loyang?

Pasir Ris (EWL) and Tampines (EWL) are the nearest existing interchanges; CRL1 connects them directly to the east.

Register for VVIP Priority Access

Be first to receive floor plans, indicative pricing & showflat invitation — Direct Developer Price, no agent fees.

Register Interest WhatsApp Jet Lee